Responsive Image Banner

UK launches its most expensive road project

Premium Content

Construction has started on the UK’s most expensive road project, following the green lighting of National Highways’ €1.15 billion upgrade of the A428, which connects the cities of Cambridge and Milton Keynes.

Aerial view of the UK's A428 highway, to be upgraded by National Highways 16km of the UK's A428 highway is to be upgraded, says National Highways

The project involves the construction of a new 16km dual carriageway in Cambridgeshire, with the government-owned roads company saying it will reduce journey times by more than a third during peak hours.

The dual carriageway, to be delivered by Skanska, working with design partner Mott MacDonald, will include a number of new bridges spanning the carriageway and a river.

The existing road, which currently sees around 25,300 vehicles daily, is expected to accommodate an increased volume of 32,900 vehicles by 2040.

Construction was originally scheduled to start in late 2022, but faced delays due to objections from the Transport Action Network, a sustainable transport campaign group.

The group sought permission for a judicial review over concerns about the project’s consideration of climate change and nature. However, the Court of Appeal dismissed the application in May.

‘Resilient and connected future’

Transport minister Anthony Browne assured the public that the project would include a focus on carbon-neutral construction methods, such as the use of electric-powered equipment.

“It’s not just an infrastructure project,” he said, “it’s a commitment to enhancing the lives of people in South Cambridgeshire, St Neots, and beyond.”

National Highways’ executive director for major projects, Nicola Bell, called the start of construction a “momentous occasion,” describing the project’s potential to ease congestion, improve connectivity, and foster economic growth and “lay the foundations for a more resilient and connected future”.

The project is part of a broader plan to utilise savings from the largely cancelled High-Speed 2 (HS2) rail project for road resurfacing across the country.

The upgraded A428 is scheduled to open in 2027.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Almac launches spider rental range
New BA-Line has series of features suited to the rental market 
Sunbelt adds drones to US rental fleet
Partners with a leading US drone manufacturer
Loxam renews communications and wireless connections contract
Moves into ‘second generation’ agreement with GTT
CONNECT WITH THE TEAM
Murray Pollok Editor, International Rental News Tel: +44 (0)1505 850043 E-mail: [email protected]
Lucy Barnard Editor, Rental Briefing Tel: +44 (0)1892 786 241 E-mail: [email protected]
Ollie Hodges Vice President, Sales Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
International Rental News newsletter

Rental Intelligence — When You Need It, How You Need It

Stay ahead with industry trends, expert insights and global news — in your inbox.

Sign me up