CTE lift goes to work in London

By Lindsey Anderson04 December 2014

A CTE A ZED 21 JHV works in London.

A CTE A ZED 21 JHV works in London.

Power Platform Services, a UK rental company, was called upon to help dismantle the ceramic poppy installation at Poppy Field Memorial at the Tower of London. The company provided a CTE ZED 21 JHV truck-moutned AWP to complete the work.

ZED 21 JHV reaches 20.6 m of working height, a max outreach of 9.7 m and a basket capacity of 300 kg (two people and working material).

The unit features the company's H outrigger configuration with variable jacking system allows the machine to be setup on narrow, one sided (left or right) or outriggers fully jacked.

"Specifically, the narrow jacking option offers users the ability to work in restricted areas, such as for activities to be carried out on roads, hard shoulders of motorways or even possibly working inside buildings with limited workspace," the company said in a statement. "With stabilisation reduced to the right or left, the platform is able again to work safely in the hard shoulder of motorways, or public areas with limited or congested spaces."

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, International Rental Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
WernerCo provides new tower standards guide
Manufacturer provides free guide for EN1004-1 mobile towers standard, coming into force in November   
Euroedile acquires Pilosio
Combination of companies’ scaffolding rental and production experience to provide
Test drive: JCB 525-60E telehandler
KHL ‘Test drive’: equipment expert Dan Gilkes puts JCB’s 525-60E electric telehandler under the microscope
CONNECT WITH THE TEAM
Murray Pollok Managing Editor Tel: +44(0)1505 850 043 E-mail: murray.pollok@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA