Redcar steelworks furnace demolished

By Leila Steed24 November 2022

Demolition specialist Thompsons of Prudhoe has brought down the 111 m (365 ft) tall blast furnace at the SSI Redcar steelworks in the north of England

The Redcar Blast Furnace The Redcar Blast Furnace. (Photo: Teesworks)

The Redcar blast furnace - which was built in 1979 and was once said to be the second largest of its kind in Europe - had been in operation for nearly a century but closed in 2015 after the site’s owner Sahaviriya Steel Industries UK entered liquidation.

It was demolished yesterday (Wednesday 23 November, 2022) via a controlled explosion that incorporated the furnace’s associated casting houses, charge conveyors and dust catcher. 

The blow down is the latest of a number of major demolition works to be carried out at the site, which is being redeveloped to form part of a 1,821 ha (4,500 acre) manufacturing hub.

While the site’s Sinter Plant was taken down in August, last month saw Thompsons use 1.6 t of explosives to carry out the demolition of the Basic Oxygen Steelmaking (BOS) plant (part of SSI Redcar steelworks).

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, International Rental Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
US software house buys Mistral
French developer of ERP systems for rental and dealers gets new owner
Saudi Arabia’s project pipeline estimated at US$1.1 trillion
The country is said to have witnessed the highest value of project awards in 2022
Cat announces new 350 excavator
Sustainability key as new machine promises fuel reduction of up to 13%
CONNECT WITH THE TEAM
Ollie Hodges Brand Manager Tel: +44 (0)1892 786253 E-mail: ollie.hodges@khl.com
Belinda Smart
Belinda Smart Editor Tel: 44 (0)1892 786209 E-mail: belinda.smart@khl.com
CONNECT WITH SOCIAL MEDIA